Skip to content

Switchgear Stock Photos & Royalty-Free Images

All the stock photos you need and more from our global creative community.

Price is in US dollars and excludes tax and handling fees
Electrical engineer man checking Power Distribution Cabinet in the control room

Electrical engineer man checking Power Distribution Cabinet in the control room

$5
Electrical engineer working in control room.

Electrical engineer working in control room.

$5
Electrical engineer working in control room.

Electrical engineer working in control room.

$5
Electrical engineer working in control room.

Electrical engineer working in control room.

$5
Electrical engineer man checking Power Distribution Cabinet in the control room

Electrical engineer man checking Power Distribution Cabinet in the control room

$5
Electrical engineer working in control room.

Electrical engineer working in control room.

$5
Team of experts checked at the electrical and check the integrity of the system in the control room

Team of experts checked at the electrical and check the integrity of the system in the control room

$5
High and low voltage transformer bushings with electrical insulation and electrical equipment at a

High and low voltage transformer bushings with electrical insulation and electrical equipment at a

by Nelia-2
$6
Electrical engineer working in control room.

Electrical engineer working in control room.

$5
A team of experts checked the operating voltage range while inspecting the electrical switchboard.

A team of experts checked the operating voltage range while inspecting the electrical switchboard.

$5
Electrician repairs mechanism.

Electrician repairs mechanism.

$5
Electrician man instalation socket for wiring in a concrete wall

Electrician man instalation socket for wiring in a concrete wall

$5
Electrical in yellow helmet technician writing reading of meter on clipboard

Electrical in yellow helmet technician writing reading of meter on clipboard

by photovs
$10
Electrical engineer working in control room.

Electrical engineer working in control room.

$5
Objects and lifestyle

Objects and lifestyle

$5
The engineers inspected the electrical switchboard and verified the operational voltage range.

The engineers inspected the electrical switchboard and verified the operational voltage range.

$5
Electrical engineer man checking Power Distribution Cabinet in the control room

Electrical engineer man checking Power Distribution Cabinet in the control room

$5
Engineers inspected the electrical switchboard and verified the operational voltage range.

Engineers inspected the electrical switchboard and verified the operational voltage range.

$5
Before proceeding with the testing, Electrical engineer inspects the installed control panel.

Before proceeding with the testing, Electrical engineer inspects the installed control panel.

by wosunan
$5
Before proceeding with the testing, Electrical engineer inspects the installed control panel.

Before proceeding with the testing, Electrical engineer inspects the installed control panel.

by wosunan
$5
Team of experts checked at the electrical and check the integrity of the system in the control room

Team of experts checked at the electrical and check the integrity of the system in the control room

$5
Electrical engineer working in control room.

Electrical engineer working in control room.

$5
engineer checking and inspecting at MDB panel .he working with electric switchboard to check range o

engineer checking and inspecting at MDB panel .he working with electric switchboard to check range o

$5
Electrician at robot factory measurement with multimeter testing current electric in control panel.

Electrician at robot factory measurement with multimeter testing current electric in control panel.

$5
electric machines, switches, isolated on white background

electric machines, switches, isolated on white background

by puhimec
$5
The engineers inspected the electrical switchboard and verified the operational voltage range.

The engineers inspected the electrical switchboard and verified the operational voltage range.

$5
Electrical engineer working in control room.

Electrical engineer working in control room.

$5
Electrician at robot factory measurement with multimeter testing current electric in control panel.

Electrician at robot factory measurement with multimeter testing current electric in control panel.

$5
engineer checking and inspecting at MDB panel .he working with electric switchboard to check range o

engineer checking and inspecting at MDB panel .he working with electric switchboard to check range o

$5
An intertwinement of electrical wires down at the power station

An intertwinement of electrical wires down at the power station

$8