Price is in US dollars and excludes tax and handling fees
Engineer under checking the industry chilled water fan coil unit air conditioner is water cooling
Industry factory. Cooling tower in building. System work machine. Water Supply and return pipe lines
Blue collar workers are working at refinery factory.
Oil & gas operations, Congo
Engineering and metalworking technologies. New brass cylinders.
A team of engineers is examining the plumbing and water valves inside an industrial facility.
Engineer is checking the air conditioning cooling system of a major building or industrial facility.
Refinery industry engineer are working and discussing at front oil and gas industrial factory,
Engineer hold laptop tablet paper check list spray nozzle checking at pressure tank during shutdown
Safety, and Logistics for Natural Gas Freight Train
Engineers Discussing Operations at Gas Facility
Oil & gas operations, Gabon
Installation of drainage pipe system for outflow of rain a stormwater
Refinery industry engineer are working and discussing at front oil and gas industrial factory,
engineer visit and inspection site engineer at industrial site.
Contractor installing glue on plastic PVC pipes for laying a water line
Aerial view of natural gas separation plant.
Closeup of water droplets dripping from leaking garden hose pipe. Water waste, gardening equipment
Engineers inspecting industrial piping system with radios
Process of assembling underground drainage pipes for outflow of rainwater a stormwater
Petroleum chemical factory illuminated at night
Technician Operating Control Panel in Industrial Setting
Installation of an underground drainage system to allow rainwater a stormwater to exit
Engineers inspect the completed water systems to continue verifying their functionality.
Industry factory. Cooling tower in building. System work machine. Water Supply and return pipe lines
It is important to dig a trench to lay drainage pipes during heavy downpours in order to drain
A female engineer surveys a large industrial gas facility while holding blueprints.
Engineer hold laptop tablet paper check list spray nozzle checking at pressure tank during shutdown